Gas hot water replacement
Gas hot water → Daikin CO₂ heat-pump hot water.
A complete electrification assessment covering VEU eligibility, gas decommissioning, plumbing, electrical supply, tank sizing and heat-pump location.

Current VEU example: up to $560*Changeover scope
What usually changes when gas is removed
1
Existing gas unit documentedVEU evidence and eligibility are confirmed before decommissioning.
2
Gas appliance decommissionedExisting gas hot water is safely disconnected in accordance with the approved scope.
3
Electrical supply checkedThe new heat pump needs a suitable circuit and compliant electrical connection.
4
Plumbing adaptedCold, hot, valves, tempering and drainage are configured for the new system.
5
Commissioning & handoverOperation, settings and maintenance points are explained.

Up to $560*Current VEU household example for eligible gas hot-water replacement
R744Daikin uses CO₂ refrigerant
10 yearsDaikin parts & labour warranty on the hot-water heat-pump system, subject to terms
Solar-ready planningOperating schedule can be considered around rooftop PV






